
8,500 feet of sewer main to be lined this summer
Lining keeps zinc-laden ground water from entering sewer system through old pipe

Lining keeps zinc-laden ground water from entering sewer system through old pipe

Hayden Adams, Peggy Bailey, Claudine Coyle, Eva Herr, Thomas Wisner, Beth Youngblood




The 700 block of Madison is going commercial; the 500 block of N. Main is going residential


